Mark

September, 2002    

NKK Receives Order to Install Two New
Compressors for Thai Gas Company



NKK has received an order from PTT Public Company Limited of Thailand to build two gas turbine-driven compressors at PTT's gas separation plant II (GSP II) in Rayong, 200km southeast of Bangkok.

The existing GSP II with a natural gas processing capacity of 7 million m3 per day was also designed and constructed by NKK in 1990. In an effort to minimize the plant's operating costs, PTT decided to install two new compressors, a 4.5MW unit for sales gas boosting unit for refrigeration. The units are expected to start operation in January 2004.

NKK formed a consortium with NKK Engineering Thailand Co. (NET) to land the full-turnkey contract. NKK will be involved in basic design and major equipment procurement, with NET in charge of installation work locally, using compressors made by Mitsubishi Heavy Industries and gas turbines made by Solar Turbines of the U.S.

PTT Public Company is Thailand's fully integrated gas and petroleum firm, which was established in October 2001 as a result of the privatization of Petroleum Authority of Thailand. With annual sales of 377,902 million baht in fiscal 2001, the company develops, produces and distributes gas and petroleum throughout the country.

To meet the rapidly growing demand for energy sources in the Asian region, NKK intends to secure further contracts for energy-related plant construction and upgrading projects by maximizing its cooperation with NET, which has vast experience and competitive strength deeply rooted in the Thai market.

 

Contract signing at PTT's headquarters in Bangkok

All Rights Reserved, Copyright © NKK Corporation  Terms and Conditions
Head Office: 1-1-2, Marunouchi, Chiyoda-ku, Tokyo 100-8202, Japan
Tel: +81 3 3212-7111, Fax: +81 3 3214-8400
http://www.nkk.co.jp/en/


Back